Post Widget 1

Heath Tips

  • In enim justo, rhoncus ut, imperdiet a
  • Fringilla vel, aliquet nec, vulputateDonec pede justo,  eget, arcu. In enim justo, rhoncus ut, imperdiet a, venenatis vitae, justo.Nullam dictum felis eu pede mollis pretium.

Post Widget 2

Teesta River In Full Spate, Rescue Efforts In Progress In Sikkim

Teesta River In Full Spate, Rescue Efforts In Progress In Sikkim

Teesta River In Full Spate, Rescue Efforts In Progress In Sikkim

Guwahati:

With North Sikkim cut off by a raging Teesta river, rescue efforts are in progress on a war-footing. A temporary bamboo bridge has been built at Chungthang connecting it to Pegong.

Beyond Pegong, roads and bridges connecting north Sikkim to the rest of the state has been washed away.

After the devastation, Chungthang was completely cut off from Pegong.

The construction of the temporary bridge was a priority, as it will enable transportation of stranded tourists and locals to the other side from Chungthang.

People involved in the Project Swastik of the Border Roads Organisation have established the first composite footbridge over Teesta river at Chungthang, facilitating the rescue of 50 stranded tourists from disaster-hit Lachen Valley today, BRO sources added.

The Indo-Tibetan Border Police rescued 56 civilians at Chungthang via a zip line. Of the 56 civilians rescued, there were 52 men and four women.

admin

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Read also x